2 Pack Utility Knife Box Cutter Retractable PVC Pipe Cutter

2 Pack Utility Knife Box Cutter Retractable PVC Pipe Cutter

$14.99
Sale price  $14.99 Regular price  $20.99
Skip to product information
2 Pack Utility Knife Box Cutter Retractable PVC Pipe Cutter

2 Pack Utility Knife Box Cutter Retractable PVC Pipe Cutter

$14.99
Sale price  $14.99 Regular price  $20.99
FREE shipping on orders $50+· add $35.01 moreShips from West Long Branch, NJ. Typically arrives in 3–7 business days.
30-day returnsChanged your mind? Send it back within 30 days. Return policy
Secure checkoutQuestions? Call 1-888-460-3822 · Mon–Fri 9–5 ET

Key features

  • All-Metal Construction: Built with a lightweight yet durable aluminum alloy shell and a sharp SK-5 high carbon steel blade, this box cutter delivers reliable cutting power for everyday tasks. Suitable for cutting a wide range of materials from paper and cardboard, to rope, carpet, packaging film, and medium-thickness plastics like foam boards and blister packs. The full-metal handle enhances longevity and provides a solid, comfortable grip
  • Retractable Blade Design: Features a retractable blade system with multiple fixed lengths, allowing precise control during operation. The slider mechanism locks the blade firmly in place to prevent accidental slips or retraction. This design improves cutting accuracy and ensures safer handling during both indoor and outdoor use. Ideal for packaging, crafting, and warehouse work
  • Slim and Portable: Measuring just 5.9 inches in length with a slim 0.6-inch profile, this box cutter retractable fits easily into pockets, drawers, and toolboxes. A built-in lanyard hole allows for optional hanging or tethering. The compact structure is ideal for small workspaces and on-the-go use, keeping your cutting tool accessible and organized at all times
  • Quick Blade Replacement: Blades can be replaced in seconds using a standard screwdriver. The interior holds the blade securely with a fixed screw mechanism, ensuring stability during cutting. Compatible with most standard SK-5 utility blades, the box cuttes provides a simple and efficient way to maintain performance without needing special tools or complex procedures
  • 8 Color Options: Available in 8 distinct colors—black, blue, green, orange, pink, red, silver, and yellow—this razor knife adds both style and practicality to your toolkit. The color variety makes it easier to assign tools by project, team member, or environment, while also reducing the risk of misplacement or confusion in multi-user settings

Free shipping on orders $50+. 30-day hassle-free returns.