Skip to product information
Check Cord Dog Leash Long Lead Obedience Recall Training Tracking Line 30ft
$29.99
Sale price
$29.99
Regular price
$46.99
FREE shipping on this itemShips from West Long Branch, NJ. Typically arrives in 3–7 business days.
30-day returnsChanged your mind? Send it back within 30 days. Return policy
Secure checkoutQuestions? Call 1-888-460-3822 · Mon–Fri 9–5 ET
Key features
- SUITABLE THICKNESS CHECK CORD: To find a balance between weight and strength. 3/8” is a suitable thickness for long training dog leash, it has both strength and portability
- NO TANGLE LONG ROPE LEASH: the round climbing rope and 360 degree rotating clasp design long training leash will not tangle whether it is in use or when you roll it up, great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls, and swimming
- LIGHTWEIGHT AND NOT ABSORB WATER: soft and lightweight Non-absorbent material won't get more and more heavy in the water and won’t sink, it will float when submerged and highly visible against any background.
- SOFT AND DURABLE DOUBLE LAYER WOVEN HANDLE: check cord has a comfortable woven double layer handle, the joint of the rope is sewn by the machine and is very strong.
- SIZE: 3/8" (9.5 mm) in diam ,Size of this one is 30foot,color orange, by 10 foot 15 foot, 30 foot and 50 foot three length for different training purpose
Free shipping included. 30-day hassle-free returns.







